Phase One costs updated

man on white ladder

Our architect, Peter Preston (Manifest Design Workshop), has finalised the drawing of Phase 1 which addresses all the external works to remedy the causes of damp, and improve access to the building for those who have difficulty with their mobility. A French drain will be built around the walls of the church, the capacity of the downpipes increased by adding additional downpipes which will be connected to the main drainage via the hall. Additionally, the walls will be repointed with lime mortar (where necessary), various stonework repaired and new glazed doors installed on the porch entrance.

A review of these costs are currently underway by the church leadership.

What do you think?